By using our website, you agree to the use of our cookies.

Advertisement

2023 GOVERNORSHIP AND
STATE HOUSE OF ASSEMBLY ELECTIONS

  • days
  • Hours
  • Minutes
  • Seconds
🇳🇬 👍 🇳🇬
FG Flags Off Emergency Repairs on Third Mainland Bridge, Approves Repairs of Over 260 Roads Nationwide
Dave Umahi
Press Release

FG Flags Off Emergency Repairs on Third Mainland Bridge, Approves Repairs of Over 260 Roads Nationwide

Advertisement

PRESS RELEASE

The Renewed Hope administration of the President of the Federal Republic of Nigeria,His Excellency Sen. Asiwaju Bola Ahmed Tinubu, GCFR is set to make a historic mark in road Infrastructure revolution in Nigeria. This was revealed by the Hon. Minister of Works, His Excellency, Sen. Engr Nweze David Umahi, Con during the flag-off of the emergency repair of the Third Mainland bridge, Lagos on the 8th day of November, 2023. The Hon. Minister during the event reiterated the determination of the President to turn around the accumulated ugly conditions of the Nigerian roads particularly the Federal Highways.

Advertisement

2. Speaking on the essence of the emergency repair of the Third Mainland Bridge, the Hon. Minister said that the conditions of the bridge superstructure and other elements including the loops and ramps connecting the bridge were bad and required urgent maintenance to serve the road users better. ” This is yet another milestone in the actualization of the Renewed Hope agenda of the Divine President Bola Ahmed Tinubu administration which among other things is aimed at the total repositioning of the road and bridge infrastructure in Nigeria and to bring succour to road users who have suffered the effects of the decayed infrastructure over the years,”

3. The Hon. Minister recalled that the immediate past administration had awarded a contract for the comprehensive repair of the loops and ramps connecting to the Third Mainland bridge at the total cost of N6,278,063585.58. But the Renewed Hope administration of Mr President upon coming on board observed that the intervention was for a limited scope as it would not address the problems created by the extra layers of asphalt on the bridge deck of about 150mm thickness that occurred as a result of previous overlays which constitute extra dead load on the bridge.”

4. According to the Hon. Minister, “it therefore became imperative to expand the scope of works as awarded to accomodate the additional works and quantities of work items needed to restore the integrity and serviceability of this very important bridge” Hence, the need to expand the scope of the contract which is now “awarded to Messrs CCECC Nig Ltd in the sum of N21,047,430,431.71.

Advertisement

5. The Hon Minister who used the opportunity to thank the President of Nigeria for approving the repair of over 260 Federal Roads across the nation also reiterated his Ministry’s commitment to quality and timely delivery of road and bridge infrastructure in Nigeria, pointing out that under his watch, the road users will not suffer discomfort and inconveniences because of road repair.He maintained that his Ministry’s target is to emeliorate the sufferings of road users and give them the best comfort anyone can get in advanced countries of the world.
On his own part, the Lagos State Governor who was represented by his Deputy, His Excellency, Dr Femi Hamzat assured the Hon Minister of Works of a robust partnership in the road revolution agenda of Federal Government, as far as Lagos State is concerned. He praised the initiative of the Federal Government in tackling the deficiencies in road Infrastructure across the nation.

The Governor also assured road users of adequate traffic management within Lagos State and adequate traffic plan during the festivities. The Governor thereafter performed the flag-off ceremony at the instance of the Hon. Minister of Works.

6 Repair works on the four ramps on the Third Mainland bridge started in earnest on the 6th day of November,2023 and is expected to be completed on or before 13th December,2023. The work of the major carriageway of the bridge will commence on 15th January,2023

Hon. Barr. Orji Uchenna Orji
Chief Press Secretary to the Hon Minister of Works. 8th November,2023

Advertisement


Disclaimer

Contents provided and/or opinions expressed here do not reflect the opinions of The Pacesetter Frontier Magazine or any employee thereof.

Support The Pacesetter Frontier Magazine

It takes a lot to get credible, true and reliable stories.

As a privately owned media outfit, we believe in setting the pace and leaving strides in time.

If you like what we do, you can donate a token to us here. Your support will ensure that the right news is put out there at all times, reaching an unlimited number of persons at no cost to them.

Related posts

Leave a Reply

Required fields are marked *